Decontamination, Closure, and Site Investigations for Six Facilities of Major Industrial/Manufacturing Firm

PES performed site characterization studies and assisted in industrial site closure projects at six of this client’s facilities in Menlo Park, Palo Alto, Mountain View and San Jose. These projects were part of the client’s restructuring and consolidation of industrial and manufacturing operations. PES’ involvement included developing closure plans, preparing plans and specifications, assisting in contracting selection, performing oversight of contractor operations, collecting samples to document effectiveness of closure, and preparing post-closure documentation.

PES also performed site characterization studies at two of the client’s Menlo Park facilities. These projects included preparation of soil and groundwater sampling plans, development of health and safety plans, performing field investigations, interpretation of analytical data, and preparation of reports for assessment of the extent of organic and inorganic contaminants from point and non-point sources.